Wildmare Bridge No. 7148 Replacement
Construction of reinforced cast-in-place concrete bridge abutments on steel piles. Located in Chetwynd, British Columbia. The work generally consists of supply and installation of Temporary Detour Bridge, Piles, Rip rap, Concrete Pile caps, Abutment walls, Steel Structural Girders, Approaches, and Concrete Deck with top asphalt.
Project type
Bridge Replacement
Date
2015
Location
British Columbia