Delivered under the DFAA program, this project replaced four culvert crossings damaged during the November 2021 atmospheric river event. At Flume Creek and Day Road, Corrugated Steel Pipe (CSP) culverts were replaced with concrete box culverts and cast-in-place headwalls, alongside full roadway and drainage restoration. Work was executed in coordination with DFO, with strict environmental compliance during all in-stream operations.